  • Overhaul update

    Posted on January 29, 2016 by James Cooper in Uncategorized.

    Another selection of pictures from Bridgnorth featuring work being carried out over the last two or three weeks. The bulk of them show the repairs which have been carried out on the left hand cab door mounting panel. The original angle iron was seriously rusted and somewhat bent (as seen in the photos especially when […]

    Continue Reading...
    No Comments.
  • Overhaul update

    Posted on January 7, 2016 by James Cooper in Uncategorized.

      Today saw work proceeding on three different fronts: A task for the working party requested by the SVR was the removal of the expansion links, and the right hand side one was tackled today. This is the space it previously occupied.       Most of the assembly on the floor: the link itself […]

    Continue Reading...
    No Comments.