Members' Portal
Account
About us
Our locomotive
News
Media
Sales
Webshop
Join us
Contact us
Members’ portal
Account
Search for:
Search Button
Overhaul update
Overhaul update
In the Boiler shop: The new flange on the side of the inner firebox backplate has had a series of pilot holes drilled prior to enlarging them to the correct size.
Meanwhile in the machine shop: The new casting that fits over the four exhaust pipes and joins the four exhausts into one has its base machined before the mounting holes are drilled. This casting replaces that seen in the next image.
As you can see this casting is well and truly life expired! The blast pipe sits on top of the casting and would was located by the studs that are still in situ.
The old blast pipe is also in the machine shop and will be replaced by the new version show next.
The new blast pipe with the blower ring sitting on top - both are being supervised by Patrick the machine shop mascot.
© 2024 Stanier Mogul Fund. All Rights Reserved. |
Web Design West Midlands
: Mayman Design Ltd
0
0
Your Cart
Your cart is empty
Return to Shop