Although 24 August 2022 was not a working party, a visit to Bridgnorth gave an opportunity to take some photos.
![The superheater header was back on the big miller with the special cutting tool made some time ago attached.](data:image/svg+xml,%3Csvg%20xmlns%3D%22http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%22%20width%3D%22250%22%20height%3D%22200%22%20viewBox%3D%220%200%20250%20200%22%3E%3C%2Fsvg%3E)
The superheater header was back on the big miller with the special cutting tool made some time ago attached.
![It had obviously been in use, as shown by the grey of the regulator grid faces and the swarf in the bottom of the steam chamber.](data:image/svg+xml,%3Csvg%20xmlns%3D%22http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%22%20width%3D%22250%22%20height%3D%22200%22%20viewBox%3D%220%200%20250%20200%22%3E%3C%2Fsvg%3E)
It had obviously been in use, as shown by the grey of the regulator grid faces and the swarf in the bottom of the steam chamber.
![Some remedial work has been performed on the boiler at the base of the top feed housing prior to fitting the patch screw mentioned in the last update.](data:image/svg+xml,%3Csvg%20xmlns%3D%22http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%22%20width%3D%22250%22%20height%3D%22200%22%20viewBox%3D%220%200%20250%20200%22%3E%3C%2Fsvg%3E)
Some remedial work has been performed on the boiler at the base of the top feed housing prior to fitting the patch screw mentioned in the last update.