Members' Portal
Account
About us
Our locomotive
News
Media
Sales
Webshop
Join us
Contact us
Members’ portal
Account
Search for:
Search Button
Overhaul update
Overhaul update
The newly painted right hand rear sandbox has been fitted back onto the frames and we will be repeating the process with the left hand one soon.
The right hand rear sandbox back in place after cleaning and painting. The bolt heads and nuts will also be painted black over the next week or so.
On the boiler, The front tube plate showing where staff have burned out the rivets securing the front tube plate which is due for replacement. A similar job has been carried out on the sides for the firebox where the steel doorplate is to be removed ready for replacement as well.
The left hand side of the firebox showing where the securing rivets for the steel doorplate have also been burnt out.
This shows the same for the right hand side but probably a better shot than the previous one for illustrative purposes.
A view of the inside of the firebox showing where some of the copper stays on the left hand side have been drilled out prior to removal.
© 2024 Stanier Mogul Fund. All Rights Reserved. |
Web Design West Midlands
: Mayman Design Ltd
0
0
Your Cart
Your cart is empty
Return to Shop