Overhaul update
![The newly painted right hand rear sandbox has been fitted back onto the frames and we will be repeating the process with the left hand one soon.](https://staniermogulfund.org.uk/wp-content/uploads/cache/2016/10/DSCN0515/1314011089.jpeg)
The newly painted right hand rear sandbox has been fitted back onto the frames and we will be repeating the process with the left hand one soon.
![The right hand rear sandbox back in place after cleaning and painting. The bolt heads and nuts will also be painted black over the next week or so.](https://staniermogulfund.org.uk/wp-content/uploads/cache/2016/10/DSCN0516/3150699004.jpeg)
The right hand rear sandbox back in place after cleaning and painting. The bolt heads and nuts will also be painted black over the next week or so.
![On the boiler, The front tube plate showing where staff have burned out the rivets securing the front tube plate which is due for replacement. A similar job has been carried out on the sides for the firebox where the steel doorplate is to be removed ready for replacement as well.](https://staniermogulfund.org.uk/wp-content/uploads/cache/2016/10/IMG_5838/1143975614.jpeg)
On the boiler, The front tube plate showing where staff have burned out the rivets securing the front tube plate which is due for replacement. A similar job has been carried out on the sides for the firebox where the steel doorplate is to be removed ready for replacement as well.
![The left hand side of the firebox showing where the securing rivets for the steel doorplate have also been burnt out.](https://staniermogulfund.org.uk/wp-content/uploads/cache/2016/10/IMG_5839/1503865051.jpeg)
The left hand side of the firebox showing where the securing rivets for the steel doorplate have also been burnt out.