Overhaul update
![A shot of the new steel plate for the bottom of the drag box showing the various cut-outs completed.](https://staniermogulfund.org.uk/wp-content/uploads/cache/2017/01/robinspain1/140427412.png)
A shot of the new steel plate for the bottom of the drag box showing the various cut-outs completed.
![The strips which will form the sides, front and rear of the bottom plate being cut out by the SVR paid staff.](https://staniermogulfund.org.uk/wp-content/uploads/cache/2017/01/robinspain2/3669979656.png)
The strips which will form the sides, front and rear of the bottom plate being cut out by the SVR paid staff.
![The SMF's very own Robin Spain applying cutting fluid whilst drilling the holes in one of the side strips.](https://staniermogulfund.org.uk/wp-content/uploads/cache/2017/01/robinspain4/2752319857.png)
The SMF's very own Robin Spain applying cutting fluid whilst drilling the holes in one of the side strips.