Members' Portal
Account
About us
Our locomotive
News
Media
Sales
Webshop
Join us
Contact us
Members’ portal
Account
Search for:
Search Button
Overhaul update
Overhaul update
The frame section fully welded into place. The pink effect is for crack detection to ensure that the welds are sound.
The weld at the top rear of the new section. Grinding flat has begun but not yet complete.
All the checks on alignment are summed up in the final figure of 1.0mm, which is the total deviation along the length of the repair. This is probably within the tolerance allowed when the engine was first built!
© 2024 Stanier Mogul Fund. All Rights Reserved. |
Web Design West Midlands
: Mayman Design Ltd
0
0
Your Cart
Your cart is empty
Return to Shop