Members' Portal
Account
About us
Our locomotive
News
Media
Sales
Webshop
Join us
Contact us
Members’ portal
Account
Search for:
Search Button
Overhaul update
Overhaul update
After a few months of being loosely bolted into place, the right hand cab sidesheet is riveted there. The left hand one has been marked out as it is necessary to drill new holes in the new metal behind it, and will be riveted next week.
The permanent fixing of the cab side has allowed other items to be fitted, including the damper control gear and, below, the relays to the damper doors once the boiler is back in the frames.
The ex-KESR horn grinder is currently off the engine while some modification is made to improve its stability, but is seen here in more detail.
© 2024 Stanier Mogul Fund. All Rights Reserved. |
Web Design West Midlands
: Mayman Design Ltd
0
0
Your Cart
Your cart is empty
Return to Shop