Overhaul update
![Two of the pipes shown painted last time are now positioned below the left hand running plate: vacuum and boiler feed pipes.](https://staniermogulfund.org.uk/wp-content/uploads/cache/2019/05/DSCF1184/855449322.png)
Two of the pipes shown painted last time are now positioned below the left hand running plate: vacuum and boiler feed pipes.
![Both side fall plates are now complete and sitting in position, although the mounting bolts have yet to be replaced.](https://staniermogulfund.org.uk/wp-content/uploads/cache/2019/05/DSCF1180/656193907.png)
Both side fall plates are now complete and sitting in position, although the mounting bolts have yet to be replaced.
![Work has begun on mounting the cab running steps; these are the dimensions chalked and drawn on tape on the driver’s side of the trailing buffer beam.](https://staniermogulfund.org.uk/wp-content/uploads/cache/2019/05/DSCF1178/2436205804.png)
Work has begun on mounting the cab running steps; these are the dimensions chalked and drawn on tape on the driver’s side of the trailing buffer beam.