Overhaul update

Two of the pipes shown painted last time are now positioned below the left hand running plate: vacuum and boiler feed pipes.

Both side fall plates are now complete and sitting in position, although the mounting bolts have yet to be replaced.

Work has begun on mounting the cab running steps; these are the dimensions chalked and drawn on tape on the driver’s side of the trailing buffer beam.