Members' Portal
Account
About us
Our locomotive
News
Media
Sales
Webshop
Join us
Contact us
Members’ portal
Account
Search for:
Search Button
Overhaul update
Overhaul update
The “trunnions” or brackets that are mounted under the cab for the braking system removed by the Tuesday volunteers ready for cleaning and painting.
Our tender in the shed being prepared to act as an emergency water carrier along with the tender from 75069 and a tank wagon as the Bridgnorth Reverse Osmosis plant has failed so locos can only water at Kidderminster.
Finally a shot of the boiler, still wrapped in chains, to illustrate the counter balancing weights (un-machined piston castings and a coupling) attached to the front tube plate now that the smokebox has been removed which will allow safe lifting of the boiler when necessary.
© 2024 Stanier Mogul Fund. All Rights Reserved. |
Web Design West Midlands
: Mayman Design Ltd
0
0
Your Cart
Your cart is empty
Return to Shop