Members' Portal
Account
About us
Our locomotive
News
Media
Sales
Webshop
Join us
Contact us
Members’ portal
Account
Search for:
Search Button
Overhaul update
Overhaul update
The new rear frame pieces have been lightly tack-welded in place ready for full welding by a coded welder.
This picture shows the vertical edges of the original frames and the new parts ground to a 45 degree angle ready for full welding.
The replacement rear buffer beam lifted into place by a chain hoist ready for drilling through into the inner two of the four angles which join it to the main frames.
The “mag drill” positioned ready to drill one of the holes in the left hand inner angle.
The new drag box after being taken out of the rear frames. Note the newly machined main draw pin laid on top of the drag box along with other parts of the drag box.
© 2024 Stanier Mogul Fund. All Rights Reserved. |
Web Design West Midlands
: Mayman Design Ltd
0
0
Your Cart
Your cart is empty
Return to Shop